Training Videos – WA

On-Site Training Videos for Washington State

Watch the video below for a quick intro to our training documentation

Table of Contents:

Install

OSCAR LOWeFLOW Installation & Start Up
OSCAR with LOWeFLOW
OS II Install WA
OS III Installation

Design

OSCAR Design & OS 100
OS II Design WA
OS III Design
Continuous Flush Drip Design

O&M

OSCAR LOWeFLOW O&M
OS II O&M
OS III O&M

 

  1. Basal Prep
  2. Basal, Farrow Explanation
  3. Installing LOWeFLOW Basin
  4. U-Fitting
  5. Float Bracket
  6. Float Tree Part One
  7. Float Tree Part Two
  8. Float Placement
  9. Input Screen Explained











OSII Design


OSII Install


OSII O&M


Basal Prep


Basal, Farrow Explanation


Installing LOWeFLOW Basin


U-Fitting

Float Bracket


Float Tree Part One


Float Tree Part Two


Float Placement

synthetic-media
Growstone Media

Input Screen Explanation



OSCAR III TRAINING VIDEOS


OSCAR-III Design Manual


OSCAR-III Installation


OSCAR-III Operation and Maintenance